Kanal Gliwicki combines port in Gliwice Labedach of the Oder and the port of Kedzierzyn-KoAlu. By water with a length of 41.2 km has 12 locks, arranged in pairs at 6 degrees, a total of honeydew 43.60 m, including two of honeydew over 10 m.
Depth of the proposed channel was 3.5 m. At present, I reduced the silting up. Serves relevant width (12 m), but the problem could be insufficient length of about 72 m, which limits the throughput sets of forcing rozczepianie longer being pushed. The level of water issupplemented mainly from the tank reservoir Dzierzno Large rivers and Klodnica and Drama. Technical channel is sufficient, however, it requires work and odmulajacych upgrading locks and canal zeglownego. These tasks to be performed as long as the Program for Odra 2006. Currentlychannel can handle vessels with a draft of 1.60 meters, meeting the standards of Class III zeglownosci. Gliwice Strona o Channel
Recommended items
Kanal Elblaski MAP
Kanal Kedzierzynski
Your comments
|
Dodane przez Gość - martakacprowicz@poczta.onet.pl
More page I recommend to all good; -]
|
Wypowiedz się...




